West Iron County Schools is seeking a design and build bid for either a new stand alone or an attached Administration Building on the northwest area of our campus. This would be a one story ~3,300 square foot building.
We are seeking design to build bids for this turnkey project.
Project Scope: Scope of work for the project includes, but not limited to, the construction of a new 3,300 SF Administrative Building. Work includes site preparation, masonry, concrete, structural framing, roof system, exterior windows/doors, interior doors, door hardware, casework, flooring, ceiling system, window shades, secure entrance, insulation, gypsum board, painting, and mechanical, electrical (including networking), & plumbing.
Design and build must meet all State of Michigan building and energy codes requirements, and obtain all necessary permits involved in the project.
The District will host a preliminary bid meeting on Monday, March 6 at 1:00 (CST) in Room 8 of the Middle/High School to discuss any specifics and tour the build site.
Sealed bids shall be sent to Admin Building West Iron County Schools, 601 Nick Baumgartner Way, Iron River, MI 49935 until 2:00 pm (CST) Thursday, March 16, 2023. At that time, bids will be publicly opened. Bids received after the date and time specified will be returned to the bidder, unopened.
Bids will be opened at the due date/time Thursday, March 16, 2023 at 2:00 pm (CST) in the Administration Office at the beginning of the Building & Grounds Committee meeting. The Committee plans to make a recommendation to hire a general contractor to the Board at the Board meeting on March 21, 2023. See page 3 for our District Policy 6320C2 - Instructions to Bidders for more details.
We have also attached a sample design for your reference on page 4.
Please contact the administration office if you have any questions.
Thank you,
Kevin Schmutzler, Superintendent
February 23, 2023This entry was posted in General News, Notifications. Bookmark the permalink.